Instead of a steel beam I used a 4x4 crossmember and one jack .
Once I had it screwed to level (It took 2 weeks and 4 adjustments) I replaced the column with 2 4x4 ones . I need 2 more supports put in so I needed the jack for them. When I get done the kitchen and bathroom will be sturdy and level. By using the 4x4's this is only going to cost 70$. If I left the jack posts it would have cost 6 to 800$ once done.
I am feeling about 70% of my old self . Being down for a year a lot around the house suffered. I will admit a lot was on the back burner (like the floor) and painting when I got sick now is the time to catch up. I would hate to relapse and leave my wife with these problems to contend with on top of me. If all goes as planed she will have new flooring and fresh paint and counter tops in the kitchen by Christmas.
No comments:
Post a Comment